• The Indianapolis JW Marriott lighting project presented some unique challenges in terms of both construction and installation.
  • The design called for a mix of materials, from rigid leather and nearly elastic fabric. To eliminate binding, wrinkles and other visual effects, bo-mar stretched each shade over a metal frame.
  • The design also allowed very little room for error during installation – including five fixtures in a row with only 1/16 inch variance. To solve this problem, bo-mar designed a hidden ladder system with built-in junction boxes.
  • The installer said that hanging the lights was a breeze – and that when they hung the lights they were “perfect.”

From our clients

See all testimonials >

“We expect the highest levels of craftsmanship to be applied to our projects.  bo-mar is one of those firms that excites us when we have an opportunity to recommend their services.  They continue to bring our projects to life with exceptional work that we are proud to stand beside.”

Greg Wade, PLA, CPSI, CLARB Principal at Context Design